5RT *2, 7.5RT *1 installed : office cooling and heating

 

3_18_1

3_18_2

 

 

 

Categories: INSTALLATION CASE

0 thoughts on “Hybrid design of geothermal and solar heat at Daeyoo factory”

Leave a Reply

Your email address will not be published. Required fields are marked *

Related Posts

INSTALLATION CASE

Keochang singi transition town

Convergence transition town in-service      

INSTALLATION CASE

Sojeon Beollat Hanji Village Convergence

Sojeon Beollat Hanji Village Convergence facilities in-service      

INSTALLATION CASE

Jincheon crafts town and Keochang geothermal heat pump convergence 5RT*30

Geothermal heat pump 5RT- Jincheon*25 machines, Keochang*5 machines